IFS PACsecure version 3 deals with pests in section 4.13, Pest monitoring and control, which has seven requirements numbered 4.13.1 to 4.13.7. They cover a building designed and maintained to prevent infestation, a documented risk based programme, the contract with your pest control company, inspection records, the devices on site, checks on incoming deliveries, and trend analysis.
Other requirements cover doors, ceiling voids, drains, vehicles and loading areas. None of the seven is a knock out requirement, but each is scored, and pest control is one of the areas the auditor walks on site.
This guide is for the technical, quality or operations manager of a packaging plant in Gauteng or the Eastern Cape who has to carry section 4.13 through an audit. Our contract programme covers the contractor's side of section 4.13 on your site and shows you what stays with your own team. To have your current programme checked against the seven requirements, request a no-obligation site assessment for a pest control contract, or call 010 500 4661 in Gauteng or 041 004 0037 in the Eastern Cape.
Key points
- IFS PACsecure version 3 is dated February 2024. Audits against it have been mandatory since 1 October 2024.
- Section 4.13 holds seven pest control requirements. Requirement 4.13.2 lists nine points your documented programme must consider, from the bait map to rented storage.
- Under 4.13.3 a contractor can do the work, but a competent person in your company must be appointed to monitor the pest control measures, and responsibility for the actions stays with you.
- Requirement 4.13.7 asks for more than service reports. The effectiveness of the programme must be monitored, with trend analysis, and the records must be available.
What IFS PACsecure is, and who is asked for it
IFS PACsecure is the IFS standard for auditing manufacturers of packaging materials: flexible plastic, rigid plastic, paper and board, metals and alloys, glass and ceramic, other natural materials and other packaging components. South African packaging plants may also be asked for BRCGS Packaging Materials or FSSC 22000, which we covered in our post on pest control for food packaging factories in Gauteng. A plant is normally asked for IFS PACsecure by a customer, for example a food exporter or brand owner whose buyers work with IFS standards.
The current edition is the IFS PACsecure Standard, version 3 (PDF, opens in a new tab), dated February 2024. Its introduction says version 3 audits became possible on 1 July 2024 and mandatory from 1 October 2024. What follows is our paraphrase.
IFS PACsecure pest control requirements in section 4.13
Each of the seven is worded as a requirement, not a recommendation. The middle column is our paraphrase. The last column is our practical reading of who normally does the work.
| Requirement | What it requires (our paraphrase) | Who normally does it |
|---|---|---|
| 4.13.1 | Premises and equipment are "designed, built and maintained" to prevent pest infestation | Site, through maintenance and engineering |
| 4.13.2 | Risk based pest control measures are documented, carried out and kept up, in line with local law, and consider at least nine listed points | Site owns the document, contractor helps to write it |
| 4.13.3 | Where a third party does the pest control, the service contract documents the requirements above it. A competent person in the company is appointed to monitor the pest control measures, and the company stays responsible for the actions | Site appoints the person, contractor works to the contract |
| 4.13.4 | Inspections and the actions that follow are documented, the carrying out of actions is monitored and recorded, and any infestation is documented with the control measures taken | Contractor records, site closes the actions |
| 4.13.5 | Baits, traps and insect killing units work properly, are enough in number, suit their purpose, and are placed and used so that they do not contaminate product | Contractor, checked by the site |
| 4.13.6 | Incoming deliveries are inspected for pests on arrival, and findings and actions are recorded | Site, at goods receiving |
| 4.13.7 | The effectiveness of pest control is monitored, including trend analysis, and the records are available | Contractor prepares, site reviews |
The nine points in 4.13.2
Requirement 4.13.2 asks for a documented programme built on risk, and lists what that programme must consider as a minimum. In our words:
- The factory environment, meaning the pests that could be present and the ones you are targeting.
- The type of raw materials and finished products. In a packaging plant that means board, paper, cardboard cores and wooden pallets as well as film, because they give insects and rodents shelter.
- A site plan showing where control is applied, which the standard calls a bait map.
- Parts of the building that favour pest activity. The standard gives ceilings, cellars, pipes and corners as examples.
- Identification of the baits on site.
- Responsibilities, both in-house and external.
- The agents used, with their instructions for use and safety.
- The frequency of inspections.
- Rented storage, where you use it.
The last point is easy to miss. If finished cartons or reels sit in an outside warehouse that you rent, that warehouse has to be considered in your pest programme.
The reference to local law in 4.13.2 points, in South Africa, to the Fertilizers, Farm Feeds, Agricultural Remedies and Stock Remedies Act, 1947 (Act 36 of 1947), among others. Our guide to Act 36 of 1947 and pest control explains what that means for the operators and remedies on your site.
Request a no-obligation site assessment and we will walk your plant against the nine points, rented storage included.
Pest requirements outside section 4.13
Five other requirements in version 3 mention pests directly:
- Requirement 4.9.3.2 covers drainage, which must be designed and maintained to keep contamination risks down. The standard names the entry of pests as an example.
- Requirement 4.9.4.2 says that where there are false ceilings, access to the void must be provided so that cleaning, maintenance and pest inspections can take place.
- Requirement 4.9.6.2 says external doors and gates must be constructed to keep pests out.
- Requirement 4.15.1 says vehicles and containers must be checked before loading, with pests among the conditions looked for, and the checks documented.
- Requirement 4.15.5 says loading and unloading areas must be built so that the risk of pests coming in is reduced.
A plant that runs night shifts with the dispatch doors open and the lights on invites flying insects onto the floor, and an insect that lands on a moving web or sheet ends up wound into the reel or stacked into the bundle. Our posts on rodent proofing and exclusion and the goods-in inspection checklist go into the practical side.
How the auditor scores it
Under Part 1 of version 3, full compliance is an A worth 20 points, a B is 15, a C is 5, and a D, where the requirement is not implemented, is minus 20. A total of 95% or more passes at higher level. From 75% to under 95% passes at foundation level.
None of the ten knock out requirements in version 3 sits in section 4.13. The auditor can still raise a Major non-conformity against any ordinary requirement where there is a substantial failure or a process is out of control in a way that may affect product safety. A Major takes 15% off the total, and a certificate cannot be issued while it stands. No contractor can promise you a score or a certificate, and we do not.
IFS also publishes a Pest Control Guideline, version 2, which states that it is not a normative document. It was written mainly around IFS Food version 7, and our guide to IFS Food pest control covers the food factory side.
A flexible packaging example
This is a composite example, not a client. Take a flexible film printer and converter in an industrial area of Gqeberha that supplies fruit exporters, with its first IFS PACsecure audit a few months away. It has a pest control contract and a file of service reports.
A gap check against section 4.13 finds the following.
- The bait map shows the main building but not the rented warehouse across the road where finished reels are kept. That is point nine of 4.13.2.
- No competent person in the company has been appointed to monitor the pest control measures, which 4.13.3 requires, and there is no record to show an auditor.
- Reels of base film and pallets of cores are signed in at receiving with no pest check recorded, against 4.13.6.
- Service reports list catches at each device, but nobody has looked at them over time, so there is nothing to show for 4.13.7.
The quality manager is appointed in writing, the rented warehouse goes onto the map and the contract, receiving adds a pest line to its inspection sheet, and catches are trended by zone with the contractor. Our post on trend analysis in pest control shows what that review looks like.
How this fits a contract
On an ASC contract, the evidence for section 4.13 has a home. Devices are numbered on a site map in the myASConline portal, which answers the bait map point in 4.13.2. Catches are identified to species or pest group and trended for 4.13.7, and an audit pack is available on demand.
Our operators are registered under Act 36 of 1947, our technicians are employed by ASC, not subcontracted, and ASC is a SAPCA member (ASC797), owned by accredited food safety specialists. If you change provider, serviceable devices from your outgoing contractor can be kept and renumbered.
We work from our Eastern Cape head office in Gqeberha and our Gauteng office at 272 Oak Avenue, Ferndale, Randburg. See pest control in the Eastern Cape, pest control in Gauteng and our manufacturing page, or try the free compliance self-assessment.
Frequently asked questions
Is pest control a KO (knock out) requirement in IFS PACsecure version 3?
No. None of the ten knock out requirements in version 3 is in section 4.13. Each of the seven pest requirements is still scored from A to D, and the auditor can raise a Major non-conformity against any of them where there is a substantial failure.
Can we outsource pest control completely under IFS PACsecure?
You can outsource the work, not the responsibility. Requirement 4.13.3 says the requirements set out before it must be documented in the service contract, a competent person in your company must be appointed to monitor the pest control measures, and responsibility for the necessary actions stays with the company.
Does our rented warehouse fall under the pest programme?
It has to be considered. Rented storage is one of the nine points that requirement 4.13.2 says your documented pest control measures must consider, where it applies. Put it on the site plan and in the contract.
How often must the pest contractor visit?
IFS PACsecure version 3 does not set a number. Requirement 4.13.2 lists the frequency of inspections among the points your risk based measures must consider, so set it from your risk assessment and write it into the contract.
Get section 4.13 checked on your site
An ASC contract covers the contractor's side of the seven requirements on your site and shows you what stays with your team. Request a no-obligation site assessment for a pest control contract in Gauteng or the Eastern Cape. Or call 010 500 4661 (Gauteng) or 041 004 0037 (Eastern Cape), Monday to Friday 08:00 to 17:00.